box floor, failed visor attempt and misc work on the international crew cab
Published 3 years ago • 78K plays • Length 31:51Download video MP4
Download video MP3
Similar videos
-
41:21
painting the dash and installing the rubber flooring. in the international pickup
-
35:03
shrinking the door dent in the international crew and start working on the stacks
-
47:03
transforming our international crew cab 'the general' with a new a/c installation!
-
5:59
fixing bucket truck controls
-
39:01
we get a rattle can a little paint on the roof of the international 4x4
-
57:17
seized 51 chevy pickup can we get it running and driving since it was last on the road in 1976?
-
29:32
working on brakes and other misc parts on the international crew cab.
-
30:51
start on the back bumper on the general, the international crew cab pickup
-
31:31
fitting the general with a proper visor. scavenging a visor from a studebaker
-
24:19
the general is one color, finally finish the bodywork on the international.
-
35:24
sandblasting the box starting the bodywork on the box on the cummins crew cab ih
-
43:36
extending the rear fenders on the general, the crew cab international pickup build.
-
46:47
shortening the box on the crew cab cummins international harvester 4x4 body swap.
-
27:56
fixing snowmobiles and body working the roof on the international pickup daily update.
-
33:27
prepping the front of the general for paint and sand blasting the rest of the box
-
28:46
general gets a new hood ornament, fuel filler, weather stripping and a tailgate
-
41:41
building the firewall around the 5.9 cummins in the international 4x4 crew cab
-
31:53
little update on the general fix the temp gauge, make a console and more on the cummins powered ih
-
41:09
more seat swapping and we finish the rear wing windows in the international
-
12:53
fixing the broken taillight for the international pickup and do more body work to the roof