capital overhauling of 250 mw steam turbine part-19 / dpt(dye penetration test) of turbine bearings
Published 1 year ago • 608 plays • Length 5:18Download video MP4
Download video MP3
Similar videos
-
2:06
capital overhauling of 250 mw steam turbine part-1
-
1:49
capital overhauling of 250mw steam turbine part-18/ ovality check of lpt inner casing
-
6:23
capital overhauling of 250 mw steam turbine part-5/ breech nut opening and detailed explanation
-
1:30
capital overhauling of 250 mw steam turbine part-22 / ut(ultrasonic testing) of turbine bearings
-
1:50
capital overhauling of 250 mw steam turbine part -23/ facial runout of rotor
-
2:01
capital overhauling of 250 mw steam turbine part -24/ replacement of rotor sealing strip
-
3:54
kd-check: dye penetrant testing on welds
-
3:34
check assembly of 270 mw steam turbine at doosan škoda power – kemi, finland, 2022
-
6:07
hydrostatic testing: pressure vessel inspection
-
4:01
capital overhauling of 250 mw steam turbine part-17 / ip turbine stop and control valve
-
5:55
capital overhauling of 250 mw steam turbine part-7/ hp module lifting
-
8:52
capital overhauling of 250 mw steam turbine part -25/ free runout of ip rotor
-
8:00
capital overhauling of 250 mw steam turbine part-11 / hp module turn vertical
-
3:13
capital overhauling of 250 mw steam turbine part-3 / main oil pump (mop) full detailed explanation
-
6:10
capital overhauling of 250 mw steam turbine part-10/hp turbine stop and control valve
-
2:45
steam turbine advanced sealing system
-
3:50
how to do visible dye penetrant testing
-
0:47
dye penetrant test
-
3:29
dye penetrant inspection