city rail link tunnel boring machine breakthrough again at mercury lane
Published 2 years ago • 1.6K plays • Length 0:30Download video MP4
Download video MP3
Similar videos
-
1:59
city rail link tunnel boring machine (tbm) breakthrough at karanga a hape station (karangahape)
-
0:13
city rail link final tbm breakthrough
-
0:26
city rail link tunneling in mercury lane
-
0:40
city rail link tunnel boring machine turned on for first time
-
10:13
tunnel boring machines. they pierce the mountain like this.
-
6:08
tbm breakthrough, bkc to vidhynagari, mumbai metro line 3
-
6:49
crl tunnel vision september 2024
-
0:16
work underground at mercury lane
-
1:38
city rail link final tbm shift
-
0:21
tunnel boring machine breakthrough to karangahape station
-
2:55
inside the city rail link tunnels
-
1:21
city rail link's tunnel boring machine is turned on, ready to bore
-
20:02
eppenberg sbb railway tunnel - from installation to the breakthrough
-
0:22
crl karanga a hape station (karangahape) breakthrough into mined tunnels
-
0:18
city rail link mercury lane underground work
-
3:38
city rail link tunnel boring machine aotea station breakthrough
-
0:47
city rail link breakthrough | nzherald.co.nz
-
0:10
the city rail link tunnel boring machine on the move -part 1
-
1:10
crl te waihorotiu station (aotea) – dame whina cooper tbm breakthrough timelapse
-
1:30
city rail link's final tbm breakthrough celebration
-
0:22
city rail link construction mercury lane work