end of day 2 track reconstruction progress on the derailment track section
Published 3 years ago • 22K plays • Length 6:27Download video MP4
Download video MP3
Similar videos
-
4:46
track reconstruction work at the derailment site
-
6:32
tamper ride down track at the derailment site after it has been tamped
-
11:17
why the derailment at curve 18 happened
-
10:31
damage to the locomotive from the derailment
-
17:57
i prevented a train from derailing with this track repair
-
15:47
running classic trains - pap’s modular railroad of dover pa
-
20:15
shooting a thermite weld on the railroad from start to finish
-
6:01
csx rerail attempt #2
-
3:55
lining track with excavators at the derailment site
-
16:21
truing a wheel on the locomotive that was derailed
-
1:55
dropping a combo from the locomotive truck
-
15:17
hi railing the track testing out a new high tech geometry system!
-
7:44
replacing a siding stop block, plus: locomotive fueling station
-
10:20
i broke a rail today tamping on curve 14!
-
0:53
moving a narrow gage steam locomotive
-
8:02
parts of a railroad track turnout
-
0:08
frc 2024 crescendo offseason robot drive practice | 9062 teleop at the robodrome
-
4:46
riding the rails - part 2
-
11:52
nordco cx spiker - inside the cab and walk around
-
6:56
reconfiguration of a 2d structure using spatio-temporal planning and load transferring [icra 2024]
-
1:39
the last concrete segment produced for cross river rail's tunnels
-
4:17
tie gang: tie crane