fitting and alignment of the engine (project lottie ep15)
Published 1 year ago • 15K plays • Length 22:58
Download video MP4
Download video MP3
Similar videos
-
54:05
yanmar 2gm service, engine beds and finishing the engine bay refit (project lottie ep14)
-
44:14
engine removal, replacing wet foam in the skeg and cockpit drains (project lottie ep12)
-
30:50
finishing the skeg repair, new (old) seacocks and engine-bay refurbishment (project lottie ep13)
-
34:42
structural repairs and modifications on a contessa 32 (project lottie ep17)
-
14:19
we bought this 40’ sailing project! - the start of our epic aluminium find.
-
30:43
i finally sailed my project catamaran to a boatyard! (with a dinghy mast) | wildling sailing
-
17:23
bad sailboats - what not to buy - ep 232 - lady k sailing
-
24:33
deck mods to fit a new mast - new selden deck ring (project lottie ep16)
-
45:53
contessa 32 rudder repairs (part 2), new bearings and project update (project lottie ep 30)
-
47:50
installing the new (under-floor) water tank (project lottie ep10)
-
52:31
rigging u-bolts, gelcoat repairs, deck repairs, bits and bobs part two (project lottie ep19)
-
28:46
cockpit repairs and preparation for new decking (project lottie ep4)
-
27:37
refitting the chart table, nav and switch panel area (project lottie ep 25)
-
17:11
salvaged boat refit: installing led underwater lights and new rudder bearings| ep.15
-
12:17
the rescue and refit story of an 80ft former whitbread race yacht (ep. 1)
-
55:41
osmosis repair part 3 - refinishing the hull, new glass, filling and fairing (project lottie ep8)
-
11:03
contessa 26 refit ep.15 - tiller vs wheel on a contessa 26
-
22:16
floor and water tank removal on a contessa 32 (project lottie ep6)
-
22:30
new battery cables, switch and battery monitor (project lottie ep26)
-
29:57
starting the osmosis repair on this contessa 32 refit (project lottie ep5)
-
13:45
sail the seas in comfort: our yanmar engine mount upgrade and installation - ep. 2
Clip.africa.com - Privacy-policy