indot plans to close i-65, i-70 up to 3 months to lower pavement under bridges
Published 11 years ago • 1.6K plays • Length 3:05Download video MP4
Download video MP3
Similar videos
-
0:49
part of i-65 to close for indot bridge project
-
2:28
indot optimistic i-65, i-70 bridge repairs will be complete before monday
-
2:15
indot will close i-70 between north, south splits for 3 months to lower road levels
-
2:22
indot: still no timeframe to re-open i-65 bridge
-
2:29
i-65, i-70 closed at split for repairs
-
1:38
clearing up confusion about i-65/i-70 construction
-
10:40
amazing what you can get for $70! escapement time flieger chronograph review
-
8:26
05 next level of composite repair: radomes (part 2/4)
-
16:58
12. measure the thickness of a multilayer aircraft window
-
2:15
why is the north split reconstruction about to happen and what will change?
-
2:35
indot installing temporary signal at i-65 detour
-
2:33
indot plans $11m i-69 improvement between 116th street, i-465
-
2:11
indot: bridge strikes common, costly
-
2:14
indot can't speed ip work to increase south split bridge clearances, despite spectacular hit monday
-
3:15
drivers still adjusting to north split closure one week into 18-month project
-
0:36
introducing the tempo binocular perimeter
-
0:32
watch: truck after truck hits overpass
-
1:28
indot to change work zone penalty signs statewide
-
0:57
replacing an air cylinder in operation
-
5:39
the most affordable pilot (flieger) watch - beobachter bargain
-
2:05
impd officers chase down car on i-70 after lengthy pursuit
-
0:16
import of accurate map and elevation data into ugcs