installation of 10,000 , 78-in. pipe with akkerman rock slurry microtunneling mtbm in columbus, oh
Published 6 years ago • 3.1K plays • Length 0:44Download video MP4
Download video MP3
Similar videos
-
6:31
installation of gravity flow pipelines using slurry microtunneling - akkerman
-
1:39
microtunneling - accurate installation of gravity flow pipelines in wet and unstable ground
-
0:25
the first rock pilot tube installation in the usa - akkerman pilot tube guided boring
-
0:46
how micro tunneling works
-
7:26
how to install a bulkhead fitting - aquaponic plumbing
-
6:08
laying 8" c900 waterline, closeup of the crew tasks
-
3:46
riser installation
-
2:11
microtunneling / pipe jacking with grp pipes: a smart solution for sustainable infrastructure
-
13:42
trenchless installation of pipelines and utilities - michels
-
0:19
microtunneling operation
-
1:59
pipejacking microtunelling animation
-
41:34
advances in pipe jacking and tunneling tunnel boring machine tbm equipment - akkerman
-
0:23
1800 pipejack pipe installation
-
2:22
made in the midwest: akkerman's pipe jacking and tunneling equipment manufacturing
-
0:07
avn1600 mtbm - cutting head for mix ground
-
0:16
micro tunnel pipeline abu dhabi khalifa city jgs tom workshop
-
0:10
pipe jacking machi
-
5:29
akkerman bentonite injection system - reduce jacking forces on pipe jacking and tunneling projects
-
0:06
mtbm testing
-
7:44
proper pipe installation
-
0:30
first drive microtunneling in philippines