lowering the sr 99 tunneling machine’s front end back into the access pit
Published 9 years ago • 15K plays • Length 1:03Download video MP4
Download video MP3
Similar videos
-
1:08
filling in the access pit used to repair the sr 99 tunneling machine
-
1:04
crews at work inside the sr 99 tunneling machine
-
1:08
filling the sr 99 access pit (extended version)
-
5:52
digging down to repair the sr 99 tunneling machine
-
0:48
filling the sr 99 access pit
-
0:33
unclogging the sr 99 tunneling machine's cutterhead
-
3:07
changing cutting tools on the sr 99 tunneling machine
-
0:45
inside the sr 99 tunnel: a short look at bertha’s disassembly
-
5:17
tunnel boring machines in action
-
10:13
tunnel boring machines. they pierce the mountain like this.
-
10:43
3m reclaim tunnel demonstration
-
2:58
crews work inside the sr 99 tunneling machine
-
0:32
replacing a cutting tool inside the sr 99 tunneling machine
-
3:04
stp time lapse video of repairs to the sr 99 tunneling machine
-
0:54
disassembling bertha: a peek inside the sr 99 tunneling machine (may-june 2017)
-
3:10
preparing to launch the sr 99 tunneling machine beneath seattle
-
3:15
the part of the sr 99 tunnel built without bertha
-
1:31
sr 99 tunneling machine animation (2013)
-
1:46
sr 99 tunnel machine on the move
-
0:59
inside a hyperbaric chamber on the sr 99 tunneling machine
-
0:33
burying the ramps to/from the sr 99 tunnel
-
1:33
transforming the sr 99 tunnel launch pit