new heli-logging job | opening the bottom line in steep ground
Published 2 years ago • 118K plays • Length 1:45:07Download video MP4
Download video MP3
Similar videos
-
42:28
new heli-logging block | opening up the bottom line
-
2:06:04
new heli-logging cutblock | opening up with several large snags
-
0:33
starting a new heli logging job. #hardwood #fastpaced
-
51:50
87. small wood on a heli-logging job | powerwedge in action
-
56:36
epic heli-logging skills | the best air-crane footage yet | working with dad
-
12:00
building a helicopter pad deep in the forest | a heli-logging hiking adventure
-
15:13
tldw: new block in old growth, opening up along bottom boundary
-
1:46:28
dropping a monster sized tree
-
48:57
huge red cedar on a ledge | with my little saw 572 husky
-
35:05
22. a great day being a lumberjack | big cedar country
-
0:24
huge pile of logs not worked up yet on helicopter logging job. 1.3 million feet heli logging tract.
-
18:22
working into a shallow draw | where to strategically fall rotten trees on a heli job
-
15:29
109. heavy leaners | heli-logging
-
0:14
heli drop zone | woodboss.ca
-
0:14
aircrane in action
-
1:27:15
starting new block, steep ground, big wood and a sweater update
-
52:02
tree growing inside another tree | falling along the back line
-
37:33
186. jacking 3 big trees | heli-logging
-
25:55
31. beauty sunny day in the bush | heli-logging
-
5:52
tldw: finishing a block with big wood and hazards
-
26:10
132. falling & bucking on steep ground