ophir whp relocation
Published 5 years ago • 2.6K plays • Length 1:09Download video MP4
Download video MP3
Similar videos
-
3:12
animation ophir relocation
-
4:14
relocation of the ophir wellhead platform
-
3:06
installation methodology ophir whp
-
5:37
ophir full documentary spt
-
5:10
wellhead platform removal - offshore decommissioning
-
5:45
offshore intro part 1 - parts of a vessel ⛴ #ahts
-
23:09
offshore rig full knowledge- rig equipment name & their location/safety officer-hse drilling-safety
-
4:53
ophir offshore installation (highlights)
-
3:35
[imanoffshore]bts : drmc of wellhead platform for ophir decommissioning & jitang development project
-
5:01
self installing platform (sip2) - centrica f3fa - t&i methodology
-
0:24
offshore wave foundation testing by grl engineers
-
0:50
🌊 🚢 fsru wilhelmshaven project: installation of the plem (pipe line end manifold)
-
0:34
offshore structure welding
-
2:14
suction installed wind turbine (siwt) - t&i methodology
-
0:38
safe haven in the north sea
-
1:01
aveon offshore -egina suction piles sail away
-
0:50
hess piles installation at stampede
-
2:18
the johan sverdrup drilling platform installed
-
2:00:58
iciw@ftk2021 : slot 7 : excavation works for onshore pipeline installation