replacing old railway sleepers with brand new psc concrete sleepers. sleeper maintenance work.
Published 2 years ago • 415 plays • Length 2:36Download video MP4
Download video MP3
Similar videos
-
0:07
changing #sleepers #railway #engineering
-
1:00
rosenqvist sb60 removing wood ties & replacing w/ concrete ties
-
0:25
swiss variable gauge train switches from 1 000 mm to 1 435 mm gauge
-
3:48
railway track components | #sleeper | #ballast | #joint | #fastening system | #joggled fishplate
-
0:15
#shorts #railway #shortvideo how to change the concrete sleeper..realy tough work
-
12:18
by hand, wooden railway sleeper replacement, using concrete sleepers, srt thailand - thai railways
-
3:42
railway sleeper renewal | railway sleeper replacement
-
4:05
concrete sleeper production plants
-
4:32
production of concrete track sleepers
-
2:34
concrete sleeper retaining walls
-
0:15
ballast removing for sleeper #railway
-
0:59
mind-blowing railway sleeper replacement: the ultimate track upgrade! #viral #viralvideo #shorts
-
7:44
sleeper renewal at rail line//work of track maintainer//how damage sleeper change at rail line...
-
12:47
rail sleepers manufacturing process
-
11:35
huge trains masses on bad rail joints - sweet sounds of bad rails - belgrade rakovica
-
0:32
sleeper grab for concrete sleepers
-
0:29
railway track sleeper renewal by manual
-
0:36
installation of a sleeper | railway wooden sleepers