snowy 2.0 could have been built for ‘a fraction of the price’
Published 1 year ago • 1K plays • Length 7:40Download video MP4
Download video MP3
Similar videos
-
4:54
snowy hydro 2.0 needs a ‘full independent comprehensive review’ for its delays
-
3:25
staggering cost of dumped hydro energy storage project revealed
-
23:32
snowy 2.0: building tomorrow’s resilient infrastructure
-
2:37
snowy hydro 2.0 was malcolm turnbull's answer to stable renewable energy— but will it ever be built?
-
1:15
snowy hydro 2.0 project faces additional two-year delay
-
2:54
snowy 2.0 project update - october 2024
-
13:23
australia's water project failure: an economic breakdown
-
2:46
'offensive tirade': mehreen faruqi clashes with penny wong over israel in senate estimates
-
7:02
snowy hydro 2.0 reset to ‘reward’ good performance
-
1:36
'bad news' as snowy hydro 2.0 project delayed by two years
-
6:15
snowy 2.0 project facing a further ‘two year blowout’ and increased costs
-
1:45
‘greatest risk’ for snowy hydro 2.0 project is ‘still in front of them’
-
2:24
claims snowy hydro 2.0 project ‘won't ever generate power’
-
2:37
snowy hydro 2.0 is ‘far too’ expensive and costs a ‘ridiculous’ amount
-
2:02
snowy hydro 2.0 the 'worst possible project' in the ‘worst possible location’
-
8:27
critics of snowy hydro 2.0 say project could be a costly mistake | 7.30
-
3:40
former snowy hydro workers share stories for 70-year anniversary
-
8:08
plagued by delays: snowy hydro 2.0 project moving at snail's pace
-
2:21
snowy hydro 2.0 project price soars to $12 billion
-
1:36
snowy 2.0 project 'beset by problems'
-
7:39
snowy 2.0 tunnel-boring machine grinds to halt and hole appears on surface | 7.30
-
4:51
snowy hydro 2.0 is one of the most ‘complex engineering projects’ anywhere in the world