srt #1: typical tree; knots tied in advance
Published 1 year ago • 4.1K plays • Length 20:39
Download video MP4
Download video MP3
Similar videos
-
18:26
jrb garda hitch footloop, single loop variant
-
8:00
introducing jrb non-mechanical srt (with 105 lb load)
-
11:47
jrbus, part 1: dsrt
-
16:47
introducing the jrb ascender hitch, a new friction hitch!
-
11:53
single rope rappel on the munter friction hitch, tree climbing demonstration
-
19:29
convert a rappel rope into a climbing system, tree climbing demonstration, jrb hitch climbing method
-
8:11
tying the running jrb hitch
-
26:19
jrb hitch climbing 2024, tree climbing demonstration
-
22:39
tying the hedden knot and hand ascender
-
21:24
introducing the jrb universal system (jrbus)
-
25:21
introducing the jrb hitch climbing system
-
10:30
introducing the saddle hunter's hitch
-
18:38
srt and garda hitch, four recovery scenarios
-
4:53
dsrt: 2 minute climb to 25' (7.6m), tree climbing demonstration
-
16:22
jrb tree climbing, breaking in a 7.1mm rope
-
16:31
srt #2: typical tree, minimum complexity system
-
10:43
find the tree in the lane in the spot
Clip.africa.com - Privacy-policy