steam locomotive connecting rod bearings - fitting up the second bearing and installation
Published 2 months ago • 28K plays • Length 14:25Download video MP4
Download video MP3
Similar videos
-
22:58
steam locomotive connecting rod bearings - finishing up the right side rod and bearings
-
33:14
steam locomotive connecting rod bearings - making new tapered strap pin/bolts
-
18:18
steam locomotive repair: connecting rod bearing wedge screws
-
28:00
steam locomotive connecting rod bearings: shimming, tramming, and reaming for tapered bolts
-
31:35
vulcan steam locomotive connecting rod bearings: gang milling on the horizontal milling machine
-
33:08
steam locomotive connecting rods - making a new wedge and tramming in the bearings
-
16:30
steam locomotive connecting rod bearings: machining a “chair” work holding fixture
-
29:05
steam locomotive bearing wedge build: part 1
-
24:09
locomotora emd gt-26 #9405.
-
2:39
installing connecting rod bearings
-
24:59
running the old edger saw
-
33:13
boring steam locomotive connecting rod bronze bearings to size
-
24:00
steam locomotive bearing wedge build: part 2
-
25:14
milling bronze bearings for the vulcan iron works steam locomotive on my horizontal milling machine
-
18:53
machining a steam locomotive bearing wedge - part 2
-
1:00
installation of connecting rod bearings and lubricating the oil channel.
-
20:13
model steam locomotive building (connecting rods) - dyak pt 13.
-
21:20
re-facing a steam locomotive try-cock valve seat