upgrade tfs 2010 to tfs 2012 - part 6 -- configure tfs 2012
Published 11 years ago • 1.9K plays • Length 7:54Download video MP4
Download video MP3
Similar videos
-
3:50
upgrade tfs 2010 to tfs 2012 - part 5 -- restore dbs and reporting encryption key
-
5:00
upgrade tfs 2010 to tfs 2012 - part 4 -- install tfs 2012 update 1 & backup dbs and reporting key
-
4:41
upgrade tfs 2010 to tfs 2012 - part 7 -- verify upgrade success and other configuration
-
26:54
upgrade tfs 2010 to tfs 2012 - part 9 - upgrade tfs 2010 to tfs 2012 (all)
-
4:40
upgrade tfs 2010 to tfs 2012 - part 2 -- prepare sharepoint for the new system
-
2:41
upgrade tfs 2010 to tfs 2012 - part 8 -- upgrade tfs 2012 build service
-
5:56
upgrade tfs 2010 to tfs 2012 - part 3 -- prepare the new machine and install sql server
-
6:53
upgrade visual sourcesafe to team foundation server 2012
-
7:16
how to instal kit power tda 2050 from beginner #pasangkittda2050
-
12:16
upload, save dan download parameter vsd atv312 mengunakan software somove 2.9
-
2:25
how to upgrade the cmc firmware and communicate with tu 4.4
-
2:44
upgrade team foundation server with migration to a new hardware -part 1-introduction
-
19:44
migrate and upgrade tfs collection from tfs 2010 to tfs 11 beta
-
1:05
install tfs (team foundation server) 2010
-
0:35
install tfs 2010 sp1 cumulative update1(8-8 2011) on team foundation server.
-
2:32
team foundation services 2012 updates 6/4
-
17:13
migrating team foundation server to visual studio team services using database import service
-
2:19
configure team foundation server 2010 for multi servers
-
1:25
install and configure sharepoint extension on remote sharepoint 2010 for tfs
-
9:06
[microsoft egypt] deep dive into tfs 2012 - november 2012
-
3:56
create service accounts that needed for team foundation server installation
-
2:02
install or upgrade team foundation server build service 11 beta