video 233 restoration of lancaster nx611 year 7. lifting gear for port wing passed safety check
Published 6 months ago • 8.3K plays • Length 21:40Download video MP4
Download video MP3
Similar videos
-
25:09
video 258 restoration of lancaster nx611 year 7.
-
31:13
video 237 restoration of lancaster nx611 year 7.---french fuselage nose fitted to nx611
-
17:11
video 254 restoration of lancaster nx611 year 7.john talks about the lancaster jig and restoration.
-
30:07
video 235 restoration of lancaster nx611 year 7.-- port wing removed.
-
23:13
244 restoration of lancaster nx611 year 7. no 1 engine fitted to the french wing
-
22:55
256 restoration of lancaster nx611 year 7. port wing in the jig.
-
28:07
video 230 restoration of lancaster nx611 year 7 .
-
39:29
video 253 restoration of lancaster nx611 year 7. the start of fn 5 front turret assembly
-
30:52
video 255 restoration of lancaster nx611 year 7.
-
20:06
257 restoration of lancaster nx611 year 7
-
24:12
video 234 restoration of lancaster nx611 year 7. keith rivets the skin on the fuel bay cover.
-
25:39
245 restoration of lancaster nx611 year 7. wing tip fitted
-
26:19
video 250 restoration of lancaster nx611 year 7 .-- phil and the lancaster door frame
-
23:36
video 225 restoration of lancaster nx611 year 7.--winter restoration tour of lancaster nx611.
-
23:01
video 241 restoration of lancaster nx611 year 7. radar perspex cover
-
28:20
238 restoration of lancaster nx611 year 7. fitting out the fuselage nose
-
29:37
video 229 restoration of lancaster nx611 year 7 -- "just jane's" nose removed.--
-
13:08
video 231 restoration of lancaster nx611 year 7.. the last video of 2023.