w006 checking the main beam flange dimensions of semi trailer before assembling
Published 3 years ago • 204 plays • Length 0:32Download video MP4
Download video MP3
Similar videos
-
0:22
w005 checking main beam web dimensions of semi trailer before the assembling
-
5:37
w007 pressing main beam flange gooseneck curve of semi trailer before the assembling welding
-
0:40
w008 move main beam flange of semi trailer to the assembling platform
-
0:24
w009 center main beam flange of semi trailer before the assembling welding
-
0:53
w011 assembling semi trailer main beam top and bottom flange to the web before welding
-
22:53
making a new round axle beam for trailer || machining and welding trailer axle beam
-
12:47
trailer manufacturing process---main beam welding
-
17:21
diy teardrop trailer: top 5 frames | pros and cons
-
3:57
s002 (speed) semi trailer main beam top bottom flange and web assembling platform observation
-
0:17
w004 assembled main beam of semi trailer before the submerged arc welding
-
3:10
w016 tack welding main beam top and bottom flange to web together on the assembling platform
-
7:20
w030 mount rear dumping semi trailer left and right side wall to the chassis side beam
-
0:24
w019 checking top and bottom flange angle to web together on assembling platform
-
3:44
s033 semi trailer turning member welding beside the main beam bottom flange platform observation
-
2:42
w012 adjust main beam top and bottom flange to web together on the assembling platform
-
0:06
w010 small jig to find main beam flange center of the semi trailer quick
-
2:27
s008 (speed) cold straightening semi trailer main beam top bottom flange and web observation
-
0:37
w017 checking tack welding top and bottom flange to web together on the assembling platform
-
1:50
w018 checking angle of top and bottom flange to web together on the assembling platform
-
6:36
w032 stand up the left and right top side wall for the rear tipping semi trailer
-
55:28
s001 (normal) semi trailer main beam top and bottom flange and web assembling platform observation
-
1:39
w020 intermittent welding of top and bottom flange to web together on the assembling platform