wastewater release from fukushima nuclear power plant begins, what are details?
Published 11 months ago • 8.6K plays • Length 22:41Download video MP4
Download video MP3
Similar videos
-
0:41
japan to release wastewater from fukushima nuclear power plant starting aug. 24
-
0:45
japan to build undersea tunnel to release wastewater from fukushima nuclear power plant
-
2:18
japan to release wastewater from fukushima nuclear power plant starting thurs.
-
2:08
japan to release wastewater from fukushima nuclear power plant starting thurs.
-
6:17
construction begins at fukushima for wastewater release
-
8:29
inside the fukushima nuclear plant 12 years after catastrophic meltdown
-
5:12
what is the impact of the fukushima nuclear plant wastewater discharge? | abc news
-
1:43
japan releases radioactive wastewater from fukushima nuke plant
-
2:46
japan begins seawater investigation following fukushima wastewater release
-
2:53
japan to release wastewater from fukushima nuclear power plant starting aug. 24
-
2:43
japan begins seawater investigation following fukushima wastewater release
-
3:08
fukushima wastewater release to begin at around 1 pm: tepco
-
1:45
japan begins release of second batch of wastewater from fukushima nuclear plant into ocean
-
3:42
japan begins releasing fukushima wastewater into ocean
-
2:10
japan begins release of second batch of wastewater from fukushima nuclear plant into ocean
-
2:10
discharge of fukushima wastewater to start on thursday at 1 pm: japanese media reports
-
2:00
japan plans to release second batch of wastewater from fukushima nuclear plant on thursday
-
2:49
japan begins to release second batch of fukushima wastewater, despite protests...
-
2:35
first release of wastewater from fukushima nuclear power plant ends on monday
-
4:01
fukushima wastewater release started around 1 pm: nhk
-
1:00
fukushima water release | japan fukushima power plant begins second batch of water release | n18s
-
2:17
operation to test discharge of contaminated water begins in fukushima