weighing and loadout of processing platform's topside - the largest and heaviest module.
Published 3 years ago • 21K plays • Length 3:46Download video MP4
Download video MP3
Similar videos
-
2:17
part #6 vietnam - the final stage, the topside loadout
-
6:00
moving massive furnace modules using the power of 322 spmt axle-lines
-
3:21
part #5 vietnam - mega jack 5200 in action to jack up the 14,000t topside
-
2:22:52
fixing the largest construction equipment on the planet | mega mechanics | spark
-
5:40
world's amazing mammoet special crane that you never thought existed
-
14:32
this is how gigantic oversized loads are transported ▶ the largest transports in the world
-
1:03
mammoet completes loadout of 3,200t jacket for dutch offshore wind farm
-
6:24
weighing up the situation before safe execution
-
2:28
part #1 vietnam - the load-out of a 12,733t jacket
-
1:24
water injection platform-2 topside loadout by lifting
-
3:27
#howwedoit - sarens moves, weighs, and jacks 21000t cpp topside module in malaysia
-
8:15
mammoet - mega load out of bp clair topside
-
3:01
part #3 vietnam - spmts in action to move the living quarters site
-
2:13
watch how 25.000t brent bravo topside moved 105m over only six hours!
-
1:24
sapura & total topside loadout
-
2:14
sandvik- careful coordination saves cost and downtime for expansion project
-
0:32
lifting topside deck installation pkwf 2022