a look at iso/iec 17025:2017 - section 8.9 management review requirements and utilization
Published 1 year ago • 1K plays • Length 33:02Download video MP4
Download video MP3
Similar videos
-
1:00:55
a look at iso/iec 17025:2017 - section 8.9 management review requirements and utilization
-
42:07
iso/iec 17025:2017 section 8.9 - management review
-
38:22
a look at iso/iec 17025:2017 - overview of the requirements specified for equipment in section 6.4
-
30:29
a look at iso/iec 17025:2017 - “personnel”
-
51:08
a look at iso/iec 17025:2017 - review of section 8.5 “actions to address risks and opportunities”
-
36:27
a look at iso/iec 17025:2017 - requirements for corrective action
-
25:27
a look at iso/iec 17025:2017 - requirements for corrective action
-
31:22
a look at iso/iec 17025:2017 - requirements concerning document control and control of records
-
1:03:09
a look at iso/iec 17025:2017 - section 8.8 on internal audits
-
2:13:06
measurement uncertainty as per isoiec 170252017
-
1:07:02
a look at iso/iec 17025:2017: sections 6.3 & 6.4
-
25:38
a look at iso/iec 17025:2017 - section 7.9 “complaints”
-
41:44
a look at iso/iec 17025:2017 requirements concerning impartiality and confidentiality
-
56:44
a look at iso/iec 17025:2017 - section 7.7 & associated requirements within pl-1
-
44:33
a look at iso/iec 17025:2017 - section 6.6: externally provided products and services
-
1:38:20
a look at iso iec 17025:2017 - document control and control of records
-
54:09
a look at iso/iec 17025:2017 - section 7.8 “reporting of results”
-
37:52
option a and b as presented in iso/iec 17025:2017 along with the management system documentation 8.2
-
52:54
iso/iec 17025:2017 - “personnel”
-
32:04
a look at iso/iec 17025:2017 - section 6.6 - externally provided products and services
-
34:41
a look at iso/iec 17025:2017 - section 7.1 “review of requests, tenders, and contracts”
-
44:23
option a and b as presented in iso iec 17025:2017 along with the management system